![]() ![]() The Department also completed the reconstruction of a collapsed retaining wall approximately 130 feet long on Old Army Road. The Department completed construction of traffic calming measures at the intersection of Mine Brook Road, Canterbury Way, and Somerville Road Extension. In 2019, pedestrian bridges at Lafayette Lane, Stonehouse Road, and Southard Park were all replaced with new bridges. The Department continued with the replacement of several pedestrian bridges in the Township. The Department completed sidewalk improvements at various locations within the Township, including the replacement of approximately 500 feet of asphalt sidewalk with concrete sidewalk on South Finley Avenue between Collyer Lane and Lake Road. Juniper Way between South Maple Avenue and Manchester Drive received drainage improvements to alleviate icing conditions within the roadway. ![]() Manchester Drive, Juniper Way, Goltra Drive, Radel Place, and Fairview Drive East (total of 2.4 miles of roadway) were reconstructed using Full Depth Reclamation, which is a more environmentally friendly road reconstruction process that minimizes costs. Manchester Drive, Goltra Drive, Radel Place, and Fairview Drive East received significant lengths of granite block curb replacement. Stormwater infrastructure was repaired and new stormwater facilities were installed. ![]() Sidewalks were repaired and ADA compliant curb ramps were constructed. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |